Questions, answered plainly

How the matching works, what the labels mean, and where the limits are. We would rather explain them here than have you find them mid-install.

Matching

How a candidate becomes a match

No, and any tool that claims otherwise should worry you. A match means the specification fields we hold line up, with every difference flagged. The final call — installation context, local code, the inspector — remains yours. What we remove is the hour spent reading four datasheets to get to that decision.

Because sometimes it is the right answer, and hiding it does not help you decide. A part with lower interrupting capacity appears with an amber flag on the result card and a highlighted cell in the comparison table. You see it, you see why, and you choose.

It is the share of the category's specification fields where the candidate's value is the same as the original's (ignoring capitalisation and extra spaces). Every compared field counts the same.

A score is never the whole answer. A high score with one critical field different can be a worse candidate than a lower one, so open the comparison and check which fields differ before you decide.

Each result is labelled by its match percentage:

  • Exact match: 90% or more of the compared fields are the same
  • Compatible alternative: 60% to 89%
  • Smart substitute: below 60%, so at least some fields differ and need your judgement

Data & provenance

Where every figure comes from

Published manufacturer datasheets wherever they exist. Where a figure is not published we either infer it from the manufacturer's part-family pattern and mark it clearly, or leave it marked as not published. Every value on every part carries one of those three states.

Every specification value carries a source:

  • Verified: taken from the manufacturer's datasheet
  • Pattern-inferred: estimated from the part-family pattern because the datasheet does not publish it
  • Not published: we have no figure for that field

In the comparison, each value shows a coloured dot for its source, so an inferred figure never looks the same as a verified one.

For shortlisting, yes. For sign-off, no. An inferred figure is a reasonable estimate from how the manufacturer rated the rest of that family; it is not a published number, and we never present it as one.

If an inferred value matters for your decision, ask the supplier for the datasheet, or send us the part number and we will look into it.

Tell us the part number and the field on the contact page (choose "Report incorrect information"). We check it against the source and correct it if it is wrong. If the figure was inferred rather than verified, we will say so.

Coverage

What is in the index and what is not

Send it to us. Coverage is deepest in electrical distribution and grows on request — most additions take a few days once we have a datasheet to work from. You can also use Contribute to submit a cross-reference you have verified yourself.

Submissions from the Contribute page go to our team for review. A person checks the suggested match against the published data before it is added to the index; submissions that cannot be confirmed are not published.

Using the site

Search and compare

Switch the search from Part Number to By Specification, choose the category and fill in the values you know, such as current, poles or voltage. You get the parts that match those values.

Up to four. Select them from the results and open the comparison: fields are lined up in rows, values that differ from the original are highlighted, and each value shows whether it is verified, inferred or not published.

Limits & safety

What we will not do

We can show you every field that differs and where each figure came from, and we are glad to talk through a specific comparison with you.

What we will not do is sign off an installation. That judgement belongs to the engineer responsible for it, working to local code and the conditions of the actual panel.

No. They are two different tests with different pass conditions: a UL 489 device must remain serviceable after clearing its rated fault, while an IEC device may be rated for an ultimate capacity it is not expected to survive in service.

It is the substitution most likely to fail an inspection weeks after sign-off. The long version is here.

CROSS-REFERENCE WITH CONFIDENCE

Have a part number? Find its equivalent.

Put IDequal to the test. Enter a part number you already know and discover matching electrical components in seconds.

Search by brand and part number
PART NUMBER FS130015A
READY
MATCH FOUND Equivalent components
03